A cost estimate is the approximation of the cost of a program, ... If, for example, a project estimate was $1,252,000 for a specific scope and conditions, and at ...
Basis of estimate (BOE) is a tool used in the field of project management by which members of the project team, usually estimators, project managers, or cost analysts, calculate the total cost of the project. Through carefully planned equations, hierarchical listing of elements, standard calculations, checklists of project elements and other ...
Analogous Estimating: Using the cost of similar project to determine the cost of the current project; Determining Resource Cost rates: The cost of goods and labor by unit gathered through estimates or estimation. Bottom Up estimating: Using the lowest level of work package detail and summarizing the cost associated with it.
A Allocation of costs is the transfer of costs from one cost item to one or more other cost items. Allowance - a value in an estimate to cover the cost of known but not yet fully defined work. As-sold estimate - the estimate which matches the agreed items and price for the project scope. B Basis of estimate (BOE) - a document which describes the scope basis, pricing basis, methods ...
Cost engineering is "the engineering practice devoted to the management of project cost, involving such activities as estimating, cost control, cost forecasting, investment appraisal and risk analysis". [1] ". Cost Engineers budget, plan and monitor investment projects. They seek the optimum balance between cost, quality and time requirements."
The most basic element of a cost estimate and therefore the cost database is the estimate line item or work item. [3] An example is "Concrete, 4000 psi (30 MPa)," which is the description of the item. In the cost database, an item is a row or record in a table (of items) and the description is a column or field for that record.