A cost estimate is the approximation of the cost of a program, project, or operation. The cost estimate is the product of the cost estimating process. The cost estimate has a single total value and may have identifiable component values. A problem with a cost overrun can be avoided with a credible, reliable, and accurate cost estimate.
Construction cost - the total cost to construct a project. This value usually does not include the preplanning, site or right of way acquisition, or design costs, and may not include start-up and commissioning costs. This total or subtotal is usually identified as such in an estimate report.
Estimators use a cost database to store data in structured way which is easy to manage and retrieve. Details Costing data. The most basic element of a cost estimate and therefore the cost database is the estimate line item or work item. An example is "Concrete, 4000 psi (30 MPa)," which is the description of the item. In the cost database, an ...
A Basis of Estimate (BOE) is an analyzed and carefully calculated number that can be used for proposals, bidding on government contracts, and executing a project with a fully calculated budget. [2] The BOE is a tool, not just a simple calculation, it is created through careful analysis and intricate calculations that create a specific number ...
Cost estimation models are mathematical algorithms or parametric equations used to estimate the costs of a product or project. The results of the models are typically necessary to obtain approval to proceed, and are factored into business plans, budgets, and other financial planning and tracking mechanisms.
Overview. One key objective of cost engineering is to arrive at accurate cost estimates and schedules, and to avoid cost overruns and schedule slips. Cost engineering goes beyond preparing cost estimates and schedules by helping manage resources and supporting assessment and decision-making.